How the 80/20 and 90/10 tender systems work
South Africa’s Preferential Procurement Regulations, 2022 award price points and specific-goal points. The 80/20 system allocates up to 80 points to price and 20 to the tender’s specified goals. The 90/10 system allocates up to 90 points to price and 10 to those goals.
For goods and services, the price formula compares a tender with the lowest acceptable tender. For an income-generating contract, such as a lease or disposal, it compares bids with the highest acceptable tender. The applicable system and goals must be set out in the tender documents. If the invitation says either system may apply, the regulations use the lowest acceptable tender for goods and services, or the highest acceptable tender for income-generating contracts, to select between them.
80/20
For tenders with a rand value at or below R50 million, where the tender documents specify this system. One goal point is equivalent to 1.25% of the price component.
90/10
For tenders with a rand value above R50 million, where the tender documents specify this system. One goal point is equivalent to 1.11% of the price component (rounded to two decimals).
There is no R30,000 minimum in the 2022 regulations
National Treasury’s implementation guide explains that the previous R30,000 minimum was omitted from the 2022 regulations. This calculator therefore does not switch the preference system off for smaller tenders. Tenders advertised before the 2022 regulations took effect on 16 January 2023 may fall under the previous rules, so check the tender date and its stated evaluation method.
Specific goals and tie-breaks
The tender document sets the specific goals, their point allocation and the proof required. The 2022 regulations do not provide a universal B-BBEE status-level point table. The historical table above is not a default scoring method. If total points tie, the bid with more specific-goal points ranks higher; if the bids are equal in all respects, the regulations say the award is decided by drawing lots.
What this calculator does not score
It does not assess mandatory returns, functionality thresholds, local production requirements, price reasonableness, exclusions, exemptions or other tender conditions. A bid can fail before price and specific-goal scoring. Use only bids that are acceptable under the tender rules when entering competitors.